Photos Website Property Flyer

About the Property

NorthPark35 is a new Class A industrial park in Georgetown, Texas, developed and owned by Titan Development. This site is located at the northernmost point of the Austin MSA at the intersection of IH-35 and SH-130, making it an ideal location for distribution and manufacturing companies.

  • Brand new Class A spec industrial park
  • Triple freeport tax exempt
  • Located at the intersection of IH-35 and SH-130 in booming Georgetown, Texas
  • Minutes from the Round Rock Premium Outlets, IKEA and many single-family residential neighborhoods including Teravista
Building II Building III Building V
Address 201 Velocity Drive, Georgetown, Texas TBD Velocity Drive, Georgetown, Texas TBD Velocity Drive, Georgetown, Texas
Total Size 158,351 SF 172,679 SF 297,057 SF
Available Space 28,791 – 115,164 SF 28,780 – 172,679 SF (Full Building) 100,000 – 297,057 SF (Full Building)
Timing Shell Complete, Move-In Ready Groundbreaking: September 2021

Delivery: April 2022

Groundbreaking: January 2022

Delivery: September 2022

Clear Height 32′ 32′ 36′
Column Spacing 52’ x 53′-9″ typical bay with 60’ speed bay 52’ x 53′-9″ typical bay with 60’ speed bay 50’ x 52′ typical bay with 60’ speed bay
Dock Doors 24 35 59
Ramps 1 2 4
Building Depth 275′ 275′ 566′
Sprinklers ESFR ESFR ESFR
Truck Court Depth 135′ 130′ 185′
Power 1200 Amps 2000 Amps 3000 Amps
Owned by Polk Street Industrial Polk Street Industrial Titan Development

Property Details

  • Available space: 584,900 SF
  • Max contiguous: 297,057 SF

Availability

Building Suite/Floor Space Available Rental Rate Operating Expenses Date Available
Building II Partial Building 28,791 - 115,164 SF Please call for rate Please call for expenses Shell Complete, Move-In Ready
Building III Full Building 28,780 - 172,679 SF Please call for rate Please call for expenses Delivery April 2022
Building V Full Building 100,000 - 297,057 SF Please call for rate Please call for expenses Delivery September 2022